| Projects ::::::::
Erection
Services |
|
|
PHCN |
: ABA 132/33 KV Substation |
LFN Ltd |
: 1.75MW Gas Power Generation |
HFL |
:6 X 1.25MW Diesel Generation |
DUFIL |
: 1 x 500kVA Gas Power Generation |
PHCN |
:2X150MVA 330/132/33KV Substation
at Calabar, Nigeria |
PHCN |
: 2X40MVA 132/33KV Substation at
Okada |
PHCN |
: 132kV Line Bay extension at Benin
North, Nigeria |
|
|
| |
| Electro-Mechanical & Civil Construction |
MBH is a full-service engineering and contracting firm for numerous
industries. We perform detailed engineering and construction for all facets of
work. It is important to note that MBH self-performs 95% of this work. We do not
subcontract primary disciplines of work. Our own labor forces perform disciplines
such as design, civil, and electrical. By self-performing these disciplines MBH
has control over scheduling and costing for projects.
The procedures that we follow concerning project management administration
vary greatly and depend upon the type, complexity, schedule and size of a
project. There are two guidelines which we follow every time. MBH always
assigns a separate project manager skilled in their particular discipline for each
area that might be involved on a job whether it is electromechanical or civil. A
lead project manager is assigned to be the sole contact with the owner on multidiscipline
jobs.
Project managers are based at our main office and make weekly trips or more, if
necessary, to the job site to assist in coordinating construction activities by
checking on progress, safety, quality, schedule and costs. We can, and have,
placed project managers on-site on a full-time basis, but do not feel that this
practice is normally required.
|
|

|
We feel that our project managers further the needs
of the project at the home office where they can have immediate access to
control engineering, procurement, expediting, billing, etc. The project managers
are in daily contact with their site superintendents.
MBH's skilled field personnel play a critical part in maintaining high productivity
levels on every project. Superintendents perform a vital role in controlling all
aspects of the day-to-day operations at the job site. All general foremen,
timekeepers, material expediters or other personnel report directly to the
superintendent. The general foremen that we utilize on our projects are all
company men. We do not use personnel that we are unfamiliar with in these
roles.
MBH Power Ltd has been "working as partners" with numerous industries in
providing cost-effective engineering and construction services as part of their
investments in new facilities as well as expansion, modernization & rehabilitation
projects and installations. |
| |
|